Denver ROW permit asphalt services are vital for property managers tackling asphalt repairs in public spaces. Harsh Colorado weather, including freeze-thaw cycles, can damage parking lots and driveways, making timely repairs essential. At Asphalt Coating Company, we streamline the permit process with free on-site inspections and same-day estimates, ensuring compliance with Denver’s regulations. Our licensed contractors use eco-friendly sealants and offer a 1-year warranty, delivering durable solutions near landmarks like Union Station and City Park.

Free On-Site Inspection & Same-Day Estimate Roadmap
Asphalt Coating Company offers free on-site inspections to assess your project’s scope. Our local crew, operating since 1986, provides same-day estimates tailored to Denver’s ROW requirements. This service prevents project delays by identifying permit needs early. For example, a parking lot repair near Denver’s LoDo district requires precise coordination with DOTI, which we handle seamlessly. Explore our parking lot repair services to see how we deliver.
Types of ROW Permits for Asphalt Work
ROW permits ensure asphalt work complies with Denver’s safety standards. The two main permits for asphalt projects are:
- Street Cut Permit: Required for asphalt repairs involving excavation, such as pothole fixes. Contractors must mark repairs with a Street Cut Pavement Repair Marker, per DOTI rules.
- Street Occupancy Permit: Needed when work blocks public spaces like sidewalks or alleys. This permit is always required alongside a Street Cut Permit.
While some sources suggest permit categories like “Class-A” or “Class-B,” Denver’s documentation refers to permits by function (e.g., cut or occupancy) rather than class. Licensed contractors obtain ROW permits to ensure compliance, preventing costly fines. Our team at Asphalt Coating Company navigates these requirements efficiently, leveraging our ADA compliance expertise.
1-Year Warranty Compliance and Insurance Requirements
Asphalt Coating Company backs every project with a 1-year warranty, ensuring repairs withstand Denver’s freeze-thaw cycles. Our warranty covers defects in materials and workmanship, offering peace of mind for property managers. Denver requires ROW contractors to carry:
- Commercial General Liability: Minimum $1,000,000 per occurrence, $2,000,000 aggregate.
- Business Automobile Liability: $1,000,000 combined single limit for owned and hired vehicles.
These insurance levels, mandated by DOTI, protect against damages during asphalt work. Our licensed and insured team meets these standards, as outlined in Denver’s ROW Insurance Requirements, ensuring your project’s compliance.
Local Crew Tips to Speed Up DOTI Approvals
Our Denver-based crew shares proven strategies to expedite ROW permit approvals:
- Submit Complete Applications: Include the DOTI Street Occupancy Request Worksheet and a detailed traffic control plan via E-Permits.
- Coordinate with DOTI: Attend bi-weekly coordination meetings to align with other contractors, especially for projects near Cherry Creek North.
- Avoid Peak Hours: Schedule traffic control outside 6-8:30 AM and 3:30-6 PM to minimize disruptions.
These steps reduce approval times, typically 5-10 business days, depending on whether the project affects residential or arterial streets. Our 24/7 emergency response ensures urgent repairs, like those caused by sudden potholes, are addressed promptly.
Frequently Asked Questions
How long does a Denver ROW permit take to approve?
Permit approval takes 5 business days for residential streets and 10 business days for collector or arterial roads, per DOTI’s guidelines. Complete applications with traffic plans expedite the process.
Do I need a separate traffic-control plan?
Yes, a traffic control plan is mandatory for ROW permit applications. It details how you’ll manage traffic and pedestrian safety during asphalt work.
What insurance levels are mandatory for asphalt contractors?
Contractors need $1,000,000 per occurrence in Commercial General Liability and $1,000,000 in Business Automobile Liability, as required by Denver’s ROW regulations.
Can emergency repairs get after-hours permits?
For emergency repairs, like sewer cuts, work can begin immediately, with permit applications due by 3 PM the next business day. Contact DOTI at 303-446-3759 to confirm asphalt repair protocols.
Is the permit fee refundable if the project is cancelled?
Permit fees, such as $0.35 per square foot for street cuts, are generally non-refundable. Verify with DOTI for specific cases, as policies may vary.
Conclusion
Navigating Denver’s ROW permit process for asphalt work requires expertise and precision. Asphalt Coating Company simplifies this with free inspections, same-day estimates, and a 1-year warranty. Our licensed contractors ensure compliance with DOTI’s requirements, from permit applications to insurance standards. Whether repairing a parking lot near Civic Center Park or addressing emergency potholes, we deliver durable, eco-friendly solutions. Contact us today to start your project with confidence.