Commercial Parking Lot Maintenance in Fort Collins

Free Quote
Call Now

Commercial Parking Lot Maintenance in Fort Collins

Hiring Asphalt Coatings Company for parking lot maintenance in Fort Collins delivers a complete pavement management plan, scheduling crack sealing, sealcoating, patching, striping, and sweeping at the intervals where each treatment delivers maximum return for property managers HOAs, and facility directors, based on Pavement Condition Index scoring and lifecycle cost analysis, not guesswork. ACC has maintained commercial parking lots across the Northern Colorado region since 1986, and over those four decades of maintaining pavement through Colorado’s 100+ annual freeze-thaw cycles and high-altitude UV exposure, ACC learned that an annual parking lot maintenance program in Fort Collins prevents the far costlier premature replacement that unmaintained pavement requires after just 12–15 years.
Every parking lot maintenance program starts with a free on-site PCI assessment where an Asphalt Coatings Company project manager walks your property, rates every pavement section on the 0–100 Pavement Condition Index scale, identifies which sections need preventive maintenance (PCI 70+), which need corrective maintenance (PCI 55–69), and which require structural rehabilitation (PCI below 55). ACC then delivers a multi-year pavement management plan with year-by-year maintenance schedules, prioritized activities, and projected budgets that reduce lifetime pavement cost by 40–60% compared to reactive repair-only approaches. The pavement management plan transforms parking lot maintenance in Fort Collins from an unpredictable emergency expense into a planned capital improvement that property managers can budget accurately and property owners can depreciate on schedule. ACC maintains parking lots for retail centers, office parks, industrial facilities, HOA communities, healthcare campuses, and municipal properties across Fort Collins, Loveland, Greeley, Windsor, Timnath, Wellington, Berthoud, Johnstown, Severance, Longmont, and Estes Park.
  • Since 1986
  • 4.7/5 Rating
  • Licensed & Insured
  • Free Estimates
Years Maintaining
Fort Collins Lots
Lifetime Cost
Reduction
Star
Rating


Parking Lot Maintenance Services in Fort Collins

Asphalt Coatings Company provides every parking lot maintenance service Fort Collins commercial properties require (crack sealing, sealcoating, patching, striping, sweeping, and drainage repair) scheduled through a pavement management plan built on PCI data and lifecycle cost analysis. Each maintenance treatment targets a specific stage of pavement deterioration.

Preventive Parking Lot Maintenance in Fort Collins

Preventive parking lot maintenance in Fort Collins addresses pavement deterioration before it causes structural damage. Crack sealing, sealcoating, and re-striping performed at the right intervals keep your PCI score above 70, preventing the accelerated decline that forces premature reconstruction. Fort Collins’s 5,003-foot UV intensity oxidizes asphalt binder 25% faster than sea-level cities, making preventive sealcoating even more critical for Colorado commercial properties. Asphalt Coatings Company schedules preventive maintenance based on actual pavement condition. Not arbitrary calendar dates, ensuring every dollar spent on parking lot maintenance in Fort Collins delivers the maximum extension of pavement life.

Crack Sealing

Hot-pour rubberized crack sealing that prevents water infiltration through pavement cracks, the single most cost-effective parking lot maintenance treatment in Fort Collins’s freeze-thaw climate.


  • Hot-pour rubberized sealant (ASTM D6690)
  • Routing & sealing for maximum adhesion

  • Blocks water penetration into base

  • Prevents freeze-thaw damage
  • Extends pavement life 3–5 years per application

Free on-site estimate

Sealcoating

Commercial-grade coal tar emulsion or asphalt emulsion sealcoat applied in two coats that blocks UV oxidation, waterproofs the surface, and restores the dark professional appearance of your Fort Collins parking lot.


  • Two-coat spray application

  • Blocks UV oxidation at 5,003 ft elevation

  • Waterproofs pavement surface

  • Restores dark, professional appearance

  • Recommended every 2–3 years in Fort Collins

Free on-site estimate

Parking Lot Striping

ADA-compliant parking lot striping with traffic-grade latex or thermoplastic paint. Maximize stall count, improve traffic flow, and maintain compliance with Fort Collins municipal parking requirements and ADA accessibility standards.


  • Standard & ADA accessible stalls

  • Fire lanes, crosswalks, directional arrows

  • Van-accessible space markings
  • Traffic-grade paint for durability
  • Layout optimization for stall count

Free on-site estimate

Corrective Parking Lot Maintenance & Repair in Fort Collins

Corrective parking lot maintenance in Fort Collins addresses pavement that has dropped below a PCI of 70 and requires structural intervention beyond preventive treatments. Asphalt Coatings Company’s corrective maintenance includes full-depth patching, infrared asphalt repair, mill-and-overlay resurfacing, drainage correction, and catch basin repair. Each corrective treatment is prescribed based on the root cause of pavement failure. Not a one-size-fits-all approach. A parking lot with base failure from water infiltration needs saw-cut full-depth patching with base compaction, while a parking lot with surface oxidation damage needs mill-and-overlay resurfacing.

Full-Depth Patching

Saw-cut removal of failed pavement sections, base repair with compacted aggregate, and installation of new hot mix asphalt, the permanent fix for potholes, alligator cracking, and localized base failures in Fort Collins parking lots.

  • Saw-cut clean edges for tight bond
  • Base excavation & recompaction

  • Hot mix asphalt. Not cold patch
  • Compacted to CDOT density specs


  • Eliminates trip hazards & liability

Free on-site estimate

Mill & Overlay Resurfacing

Remove the deteriorated surface layer by milling, then place a new hot mix asphalt overlay to restore ride quality, drainage, and appearance without full-depth reconstruction of the entire parking lot.

  • Precision cold milling to specified depth
  • Tack coat for layer bonding

  • 1.5–3 inch hot mix overlay

  • Smooth transitions at curbs & structures

  • Restores 10–15 years of pavement life

Free on-site estimate

Drainage Correction

Regrading, catch basin installation, and infrared asphalt repair to eliminate ponding water, the underlying cause behind 70% of recurring parking lot maintenance failures in Fort Collins’s freeze-thaw environment.


  • Low-spot identification & regrading

  • Catch basin installation & repair

  • Infrared seamless asphalt repair
  • Stormwater compliance solutions

  • Prevents recurring freeze-thaw damage

Free on-site estimate

Multi-Year Pavement Management Plans in Fort Collins

A pavement management plan for parking lot maintenance in Fort Collins is a multi-year schedule that sequences crack sealing, sealcoating, patching, striping, and resurfacing at the optimal intervals to minimize total lifecycle cost. Asphalt Coatings Company develops pavement management plans based on actual PCI data collected during a free on-site assessment. Each plan includes year-by-year maintenance schedules, projected budgets, and PCI targets, transforming parking lot maintenance in Fort Collins from an unpredictable emergency expense into a planned, predictable capital improvement.

5-Year Maintenance Program

Comprehensive multi-year parking lot maintenance plan for Fort Collins properties with annual PCI assessment, scheduled maintenance activities, and projected budgets for five years of proactive pavement management.


  • Annual PCI condition assessment
  • Year-by-year maintenance schedule

  • Projected annual & total budgets
  • Priority scheduling & coordination

  • Reduces lifetime cost by 40–60%

Free on-site estimate

PCI Assessment & Reporting

Professional Pavement Condition Index assessment of your entire parking lot with section-by-section scoring, condition documentation, and maintenance priority recommendations for Fort Collins property managers.


  • Section-by-section PCI scoring
  • Photographic condition documentation
  • Distress type identification

  • Maintenance priority matrix
  • Board-ready summary reports

Free on-site estimate

Lifecycle Cost Analysis

Detailed financial analysis comparing the cost of proactive parking lot maintenance in Fort Collins versus reactive repair-only approaches, demonstrating the 40–60% lifetime cost savings of a pavement management plan.


  • Proactive vs. reactive cost comparison

  • Net present value analysis

  • Annual budget projections

  • Pavement life extension modeling

  • Capital planning documentation

Free on-site estimate

Commercial Parking Lot Repair in Fort Collins

Commercial parking lot repair in Fort Collins fixes the damage preventive maintenance can no longer hold back, potholes, alligator cracking, failed pavement sections, and sunken drainage areas. Asphalt Coatings Company repairs commercial parking lots with saw-cut full-depth patching, hot-pour crack repair, and mill-and-patch resurfacing, diagnosing the root cause of every failure before prescribing the correct repair so the fix lasts through Fort Collins’s 100+ annual freeze-thaw cycles.

Pothole & Full-Depth Patching

Asphalt Coatings Company saw-cuts failed pavement, rebuilds the aggregate base, and places new hot mix asphalt compacted to CDOT density, the permanent fix for potholes and alligator cracking in Fort Collins commercial parking lots.


  • Saw-cut clean edges for a tight bond

  • Base excavation & recompaction

  • Hot mix asphalt. Not cold patch


  • Eliminates trip hazards & liability

Free on-site estimate

Crack & Joint Repair

Asphalt Coatings Company routs and seals working cracks with hot-pour rubberized sealant before water reaches the sub-base, stopping the freeze-thaw cycle that turns hairline cracks into potholes across Fort Collins parking lots.


  • Hot-pour rubberized sealant (ASTM D6690)
  • Routing for working cracks

  • Blocks water infiltration to the base

  • Extends pavement life 3–5 years

Free on-site estimate

Failed Section Mill & Patch

Asphalt Coatings Company mills out widespread surface failure and places a new hot mix overlay, restoring ride quality and drainage where damage covers too much of the lot for spot patching alone.


  • Precision cold milling to depth

  • Tack coat for layer bonding
  • 1.5–3 inch hot mix overlay

  • Restores 10–15 years of pavement life

Free on-site estimate

How ACC Diagnoses Parking Lot Maintenance Needs in Fort Collins

Parking lot maintenance in Fort Collins requires diagnosing which of Fort Collins’s three pavement-destroying forces (freeze-thaw cycling, UV oxidation, or expansive clay soils) caused each section of deterioration. The correct maintenance treatment depends entirely on the root cause, not just the visible symptom.

Linear Cracking (Thermal Contraction)

Root Cause: Fort Collins’s temperature swings, summer highs above 95°F and winter lows below 0°F, cause asphalt to expand and contract beyond its elastic limit, creating longitudinal and transverse cracks. These linear cracks are working cracks that move seasonally. Without maintenance, water enters these cracks and triggers freeze-thaw base erosion that converts a minor crack seal into a far costlier structural repair. PCI impact: each unsealed linear crack reduces your lot’s PCI score by 2–5 points per year.

ACC Maintenance: Hot-pour rubberized crack sealing (routing and sealing method)

Surface Oxidation & Raveling

Root Cause: Fort Collins’s 300+ days of sunshine at 5,003 feet elevation delivers 25% more UV radiation than sea-level cities. UV breaks down the asphalt binder that holds aggregate particles together, turning the surface gray and causing loose aggregate (raveling). Oxidized pavement becomes brittle, porous, and susceptible to water infiltration. PCI impact: advanced oxidation drops PCI by 15–25 points and cannot be reversed, only arrested through timely sealcoating.

ACC Maintenance: Two-coat commercial sealcoating every 2–3 years

Alligator Cracking (Base Failure)

Root Cause: Interconnected cracking that resembles alligator skin indicates the pavement has lost structural support from the base layer. In Fort Collins, this typically occurs when water enters through unsealed cracks, saturates the aggregate base, and 100+ annual freeze-thaw cycles erode the base material into voids. The asphalt surface, now unsupported, cracks under traffic loading. PCI impact: alligator cracking indicates PCI has dropped below 55 in that section and requires corrective maintenance.

ACC Maintenance: Full-depth patching with base repair or mill-and-overlay

Ponding Water & Drainage Failure

Root Cause: Improper original grading, settling from expansive clay soils, or clogged catch basins create low spots where water collects. Standing water softens asphalt binder and saturates the base, accelerating deterioration 3–5x faster than properly drained areas. In Fort Collins, ponding water that freezes overnight creates additional ice-expansion damage and slip hazards. Drainage problems are the hidden root cause behind 70% of recurring parking lot maintenance failures.

ACC Maintenance: Regrading, catch basin repair, infrared asphalt correction

Faded Striping & ADA Non-Compliance

Root Cause: Fort Collins’s high-altitude UV exposure and snow plow wear degrade pavement markings within 12–18 months. Faded striping reduces parking efficiency, creates traffic confusion, and exposes property owners to ADA compliance violations carrying fines of $75,000+ for first offenses. Worn fire lane markings create fire code violations. Parking lot maintenance of striping in Fort Collins should follow every sealcoating application and be inspected annually during the PCI assessment.

ACC Maintenance: Full re-striping with traffic-grade paint, ADA audit

Potholes & Depression Failures

Root Cause: Potholes are the final stage of deferred parking lot maintenance in Fort Collins. Water enters unsealed cracks, erodes the base through freeze-thaw cycling, creates sub-surface voids, and the asphalt collapses under vehicle traffic. Each pothole indicates multiple maintenance opportunities were missed: crack sealing, sealcoating, and early patching all could have prevented the pothole. PCI impact: potholes indicate PCI below 40 in that section, structural repair is the only remaining option.

ACC Maintenance: Saw-cut full-depth patching with base compaction

Proactive vs. Reactive Parking Lot Maintenance in Fort Collins

The financial case for proactive parking lot maintenance in Fort Collins is backed by lifecycle cost analysis. Properties that follow a pavement management plan spend 40–60% less over the pavement lifecycle than properties that only repair when failures become critical.

Preventive vs Reactive Maintenance (20-Year Total Cost)

Responsive Table
FactorProactive Maintenance (ACC Plan)Reactive Repair Only
Annual Cost per Sq FtBy on-site assessment$0.00 (until failure occurs)
Pavement Lifespan25–30 years12–15 years
Replacement CostDeferred 15–20 yearsBy on-site assessment
Lifecycle Cost (30 years)By on-site assessmentBy on-site assessment
Budget PredictabilityPlanned annual budget with 5-year projectionsUnpredictable emergency expenses
PCI Score TrajectoryMaintained above 70 (satisfactory)Declines steadily to below 40 (failed)
Liability ExposureMinimized through proactive managementIncreasing potholes, trip hazards, ADA issues
Property AppearanceDark, well-maintained, professional lookGray, cracked, deteriorating appearance

Managed vs Unmanaged Pavement Lifecycle in Colorado Springs

Ready to get started?

Why Fort Collins Property Managers Choose ACC for Parking Lot Maintenance

Choosing a parking lot maintenance contractor in Fort Collins comes down to six factors that directly impact pavement longevity, total lifecycle cost, and budget predictability. Asphalt Coatings Company delivers on all six.

PCI-Based Pavement Management

Asphalt Coatings Company uses Pavement Condition Index scoring to objectively measure pavement condition and prescribe the right maintenance treatment for each section of your parking lot. PCI data eliminates guesswork from parking lot maintenance decisions in Fort Collins, ensuring every dollar spent delivers maximum pavement life extension. The PCI score determines whether a section needs preventive maintenance (score 70+), corrective maintenance (55–69), or structural rehabilitation (below 55).

Lifecycle Cost Analysis

Every parking lot maintenance plan from Asphalt Coatings Company includes a lifecycle cost analysis that compares the total cost of proactive maintenance versus reactive repair over the full pavement lifecycle. This analysis demonstrates that annual maintenance spending prevents far costlier premature replacement, a 40–60% reduction in total pavement cost. Property managers and HOA boards use this analysis to justify maintenance budgets.

Full-Service Maintenance Contractor

Asphalt Coatings Company handles every parking lot maintenance service in Fort Collins with in-house crews: crack sealing, sealcoating, patching, striping, sweeping, drainage repair, concrete repair, and ADA compliance upgrades. Having one contractor manage your entire parking lot maintenance program eliminates coordination between multiple vendors and ensures a single point of accountability for pavement condition.

40+ Years in Fort Collin’s Climate

Asphalt Coatings Company has maintained commercial parking lots in Fort Collins since 1986. Four decades of maintaining pavement through Colorado’s 100+ freeze-thaw cycles, high-altitude UV exposure, and expansive clay soils means ACC understands precisely when each maintenance treatment should be applied and which products perform best in Fort Collins’s conditions. Maintenance intervals that work in other climates often underperform in Fort Collins.

Minimal Business Disruption

Asphalt Coatings Company schedules parking lot maintenance in Fort Collins around your business operations, nights, weekends, and phased work to maintain parking access throughout. Retail centers keep customer parking open, healthcare campuses maintain patient access, and office parks preserve tenant access during all maintenance activities. ACC provides traffic control, barricading, and directional signage to manage parking flow.

Predictable Annual Budgets

Asphalt Coatings Company’s multi-year pavement management plans give property managers and HOA boards predictable annual maintenance budgets with 3–5 year projections. No more surprise emergency repair costs. No more special assessments for premature reconstruction. The pavement management plan transforms parking lot maintenance in Fort Collins from an unpredictable expense into a planned capital improvement.

How Parking Lot Maintenance Works With ACC in Fort Collins

From your first call to ongoing annual maintenance, Asphalt Coatings Company’s parking lot maintenance process in Fort Collins follows five steps designed to maximize pavement life at the lowest total cost with minimal disruption to your business.

1

Free PCI Assessment

An Asphalt Coatings Company project manager walks your property, scores every pavement section on the PCI scale, documents distresses, and identifies maintenance priorities. No charge, no obligation.

2

Pavement Management Plan

Asphalt Coatings Company delivers a multi-year maintenance plan with year-by-year schedules, projected budgets, lifecycle cost analysis, and PCI improvement targets, typically within one week of the assessment.

3

Board Approval Support

Asphalt Coatings Company provides board-ready summary reports, lifecycle cost comparison charts, and plan presentations to help property managers secure stakeholder approval for the maintenance program.

4

Scheduled Execution

Asphalt Coatings Company crews execute each year’s maintenance activities on schedule (crack sealing, sealcoating, patching, striping) coordinated around your business operations with minimal disruption.

5

Annual Review & Update

Each year, Asphalt Coatings Company reassesses pavement condition, updates PCI scores, adjusts the maintenance plan based on actual results, and projects the next year’s budget and activities.

Recommended Parking Lot Maintenance Schedule for Fort Collins

Asphalt Coatings Company recommends this maintenance schedule for commercial parking lots in Fort Collins based on 40 years of managing pavement through Colorado’s freeze-thaw cycles, UV exposure, and expansive clay soil conditions. Timing each treatment at the optimal interval maximizes pavement life and minimizes total lifecycle cost.

Responsive Table
Maintenance ActivityRecommended FrequencyCost RangeROI / Impact
Crack SealingEvery 1–2 yearsBy on-site assessment6–8x ROI, extends life 3–5 years
SealcoatingEvery 2–3 yearsBy on-site assessmentBlocks UV, extends life 3–5 years
Parking Lot StripingEvery 2–3 years / after sealcoatBy on-site assessmentADA compliance, liability reduction
PCI AssessmentAnnuallyFree with ACC programData-driven maintenance decisions
Pothole / Patch RepairAs needed (identified during PCI)By on-site assessmentEliminates liability, prevents spread
Drainage InspectionAnnually (spring)Included in PCI assessmentPrevents 70% of recurring failures
Catch Basin CleaningAnnually (spring)By on-site assessmentPrevents ponding and base saturation
Mill & OverlayWhen PCI drops to 55–69By on-site assessmentRestores 10–15 years of life

This parking lot maintenance schedule is calibrated specifically for Fort Collins’s climate conditions. Properties at higher elevations, those with heavier traffic, or those on expansive clay soils may require more frequent maintenance intervals. Asphalt Coatings Company adjusts the schedule for each property based on the PCI assessment results, traffic loading, soil conditions, and drainage characteristics. Every dollar spent on parking lot maintenance in Fort Collins at the right time delivers maximum return, that is the foundation of a PCI-based pavement management plan.

Ready to Reduce Your Parking Lot Maintenance Costs in Fort Collins?

Asphalt Coatings Company provides free on-site PCI assessments with detailed pavement management plans. Tell us about your property and we will diagnose the right maintenance program for your budget and pavement condition.

Commercial Properties ACC Maintains in Fort Collins

Asphalt Coatings Company provides parking lot maintenance programs for commercial properties across the Northern Colorado region. Each property type has unique maintenance requirements. ACC develops customized pavement management plans that account for traffic patterns, operating hours, access needs, and budget cycles.

Retail Centers

Office Parks

Industrial & Distribution

HOA Communities

Hotels & Hospitality

Healthcare Facilities

Schools & Universities

Churches & Nonprofits

Municipal & Government

Auto Dealerships

Ready to get started?

CLIENT FEEDBACK

Real reviews from commercial property managers, HOA boards, and business owners across Colorado.

Frequently Asked Questions About Parking Lot Maintenance in Fort Collins

Answers to common questions from Fort Collins property managers, HOA boards, and facility directors evaluating parking lot maintenance contractors and pavement management programs.

The Pavement Condition Index is a 0–100 numerical rating system that objectively measures pavement surface condition based on the type, severity, and density of visible distresses. For parking lot maintenance in Fort Collins, PCI determines which treatment is most cost-effective: PCI 85–100 (good) needs only preventive maintenance. PCI 70–84 (satisfactory) needs more aggressive preventive treatments. PCI 55–69 (fair) requires corrective maintenance. PCI 40–54 (poor) needs major rehabilitation. PCI below 40 (failed) typically requires reconstruction. ACC uses PCI scoring to ensure every parking lot maintenance dollar is spent on the right treatment at the right time.

ACC’s PCI assessment for parking lot maintenance in Fort Collins involves an on-site inspection where a project manager walks every section of your parking lot, identifies and catalogs each type of pavement distress (cracking, oxidation, raveling, potholes, drainage issues, striping condition), rates the severity and extent of each distress, calculates a PCI score for each section, and produces a condition map showing the PCI rating across your entire property. The assessment includes photographic documentation and a written report. ACC provides PCI assessments at no charge as part of the parking lot maintenance evaluation process.

A pavement management plan is a multi-year schedule that sequences parking lot maintenance activities (crack sealing, sealcoating, patching, striping, and resurfacing) at the intervals where each treatment delivers maximum return based on actual PCI data. For Fort Collins property managers, a pavement management plan provides three critical benefits: (1) predictable annual budgets instead of emergency repair surprises, (2) documented reduction in lifetime pavement cost of 40–60%, and (3) a board-ready plan that justifies maintenance spending to owners and stakeholders. ACC develops pavement management plans based on free on-site PCI assessments.

Commercial parking lot maintenance in Fort Collins includes six core services delivered through a structured pavement management plan. First, crack sealing with hot-pour rubberized sealant every 1–2 years, sealcoating with commercial-grade coal tar or asphalt emulsion every 2–3 years, full-depth patching of potholes and structural failures as they occur, parking lot striping and ADA-compliant pavement markings every 2–3 years or after sealcoating, drainage maintenance including catch basin cleaning and low-spot correction, and annual Pavement Condition Index assessment to track pavement health. ACC performs all of these parking lot maintenance services in Fort Collins with in-house crews and commercial equipment.

ACC recommends this maintenance schedule for parking lot maintenance in Fort Collins: crack sealing every 1–2 years (annually is ideal given Fort Collins’s 100+ freeze-thaw cycles), sealcoating every 2–3 years (Fort Collins’s high-altitude UV accelerates oxidation), re-striping every 2–3 years or after every sealcoating application, patching as needed when defects are identified during annual assessment, and a formal PCI assessment annually. Fort Collins’s climate is harder on pavement than most US cities, so maintenance intervals should be at the more frequent end of industry guidelines.

Preventive parking lot maintenance in Fort Collins includes treatments that protect pavement before structural damage occurs: crack sealing, sealcoating, and re-striping. These treatments are most effective when PCI scores are above 70. Corrective maintenance addresses pavement that has already developed structural issues: full-depth patching, mill-and-overlay resurfacing, and drainage correction. Corrective treatments are needed when PCI drops to 55–69. Below PCI 40, full reconstruction is typically required.

Crack sealing is the single most cost-effective parking lot maintenance treatment in Fort Collins, delivering a 6–8x return on investment. Every dollar spent on crack sealing avoids several times that amount in future repair costs by preventing water infiltration into the sub-base. In Fort Collins’s 100+ annual freeze-thaw cycle environment, water in the base is the primary cause of pavement failure. The second most cost-effective treatment is sealcoating, which blocks UV oxidation and waterproofs the surface. ACC recommends prioritizing these two treatments above all others in any parking lot maintenance budget.

Parking lot maintenance pricing in Fort Collins varies by the specific services performed and the scope of your pavement management plan. Each treatment is scheduled based on PCI scoring and lifecycle cost analysis, so costs depend on the condition of your lot and the plan designed for it. ACC provides a free on-site assessment with a written proposal so you know exactly what your property needs.

ACC recommends setting aside an annual reserve for parking lot maintenance in Fort Collins and funding it consistently year over year. The actual amount spent each year varies based on the maintenance plan schedule, since crack sealing years, sealcoating years, and years with corrective patching each carry different costs. ACC’s pavement management plan provides year-by-year budget projections from a free on-site assessment so property managers can plan reserve contributions accurately.

Yes. ACC provides free on-site PCI assessments and detailed parking lot maintenance proposals for commercial properties in the Northern Colorado region. The assessment includes section-by-section PCI scoring, distress identification, maintenance priority recommendations, and a multi-year pavement management plan with projected budgets. There is no charge and no obligation. Call (970) 665-4441 or submit a request through our website to schedule your free assessment.

Stop Overspending on Reactive Parking Lot Repairs in Fort Collins

Asphalt Coatings Company has maintained commercial parking lots across Fort Collins since 1986. Call today for a free PCI assessment and pavement management plan that reduces your lifetime pavement cost by 40–60%.

Our Fort Collins Location